Skip to content

Libratama Group · Industrial Maintenance & Product Supply · Indonesia

They Knew Their Workforce Was There. The Data Wasn't.

Exclolab delivered a centralized employee database and structured attendance system for Libratama Group in 30 days — cutting HR admin time by 50–65%, reducing attendance errors by 70–80%, and giving an Indonesian industrial services company the data foundation it needs to build a full HRIS for the first time.

50–65%

less HR admin time — freed from manual attendance recording and verification

70–80% attendance error reduction (client confirmed)2x faster attendance verification (client confirmed)Management visibility: from zero to real-time dashboardRp 8–20 juta/month ($500–$1,250 USD) in inefficiency costs eliminated

Location

🇮🇩 Indonesia

Type of Work

Operations Platform

HR admin time reduction

50–65%

Attendance error reduction

70–80%

Delivery

30-day MVP delivery — the data foundation that makes the full HRIS possible

🖼

Libratama Group — Platform Screenshot

Coming soon

The Situation Before

What the Client Came In With

"We need an HR system to track our employees and their attendance across multiple client sites."

Libratama Group is an Indonesian B2B industrial services company managing a workforce deployed across factory and industrial clients. Despite operating at scale, HR and workforce management ran entirely on Excel spreadsheets and manual coordination. There was no centralized employee database, no reliable attendance record, and no way for management to get a clear picture of their own workforce without manually chasing data across multiple files and conversations.


The Turning Point

What Exclolab Found

Libratama Group is an Indonesian B2B industrial services company managing a workforce deployed across factory and industrial clients. Despite operating at scale, HR and workforce management ran entirely on Excel spreadsheets and manual coordination. There was no centralized employee database, no reliable attendance record, and no way for management to get a clear picture of their own workforce without manually chasing data across multiple files and conversations.


The Approach

How Exclolab Worked

Libratama didn't need a full HRIS on day one — they needed two things done right: a centralized employee database and a structured way to record attendance. Discovery confirmed this scope in the first session. We built exactly that — an MVP HR foundation in 30 days, with a clear roadmap for the full HRIS to follow. Scope restraint was itself the strategy.


The Solution

What Was Built

Libratama didn't need a full HRIS on day one — they needed two things done right: a centralized employee database and a structured way to record attendance. Discovery confirmed this scope in the first session. We built exactly that — an MVP HR foundation in 30 days, with a clear roadmap for the full HRIS to follow. Scope restraint was itself the strategy.

LayerTechnology
BackendLaravel PHP
Admin InterfaceFilament UI
DatabaseMySQL
InfrastructureDocker + CI/CD

The Results

What Changed

50–65%

HR admin time reduction

70–80%

Attendance error reduction

30 days

MVP delivery — HR foundation built

Libratama Group now has a single source of truth for employee data and attendance. HR admin time dropped 50–65%. Attendance errors dropped 70–80%. Management visibility — previously zero — now comes from a real-time dashboard. The MVP foundation is in place; the full HRIS build can proceed on solid ground.


Client Voice

In Their Own Words

Client testimonial being gathered — check back soon.


Technical Deep Dive

The Stack That Powered This

LayerTechnology
BackendLaravel PHP
Admin InterfaceFilament UI
DatabaseMySQL
InfrastructureDocker + CI/CD

Engagement Timeline

How This Was Delivered

Week 1

Discovery — HR workflow mapping, employee data audit, attendance recording requirements

Weeks 2–3

Core build — centralized employee database, structured attendance system, management dashboard

Week 4

Team training, data migration from Excel, post-launch support

Phase 2 (Planned)

Payroll integration, leave management, performance tracking — full HRIS build

Planned

30-day MVP delivery — the data foundation that makes the full HRIS possible.


Work with Exclolab

Your HR Foundation Might Need the Same Starting Point

Libratama Group didn't need a full HRIS on day one — they needed two things done right: a centralized employee database and a structured way to record attendance. Once those were solid, everything else became buildable. If your workforce management is currently running on spreadsheets and chat coordination, and you're not sure where to start, the first conversation with Exclolab isn't about which modules to build. It's the same discovery mapping Libratama went through: find the foundation that has to exist before anything else can work, then build exactly that — in 30 days.

Libratama Group — They Knew Their Workforce Was There. The Data Wasn't.